Project Scope
Supply and install;
- Five steel structure buildings (total of 700 ton) evaporation.
- Fermentation.
- Distillation.
- Final product buildings.
Along with a Supply of Qty# 30 stainless steel tanks with different capacities.
Supply and install;
Along with a Supply of Qty# 30 stainless steel tanks with different capacities.